US data centre estate
🇺🇸 United States · CoreWeave
CoreWeave reports fleet-wide rather than per site; the site-level split is not disclosed.
Path to billing
- Announced Not disclosed
- Power Not disclosed
- Build Not disclosed
- Accepted Not disclosed
- Billing Not disclosed
Each stage rolls up the project gates that evidence it. A stage marked Not disclosed has no gate on record — which is not the same as a stage the site has yet to reach.
Site view
A generic campus illustration, shown to orient the layout of a site of this kind. It is not imagery of US data centre estate, carries no live telemetry, and no element of it is positioned from data. Every factual claim on this page is in the panels around it.
Latest evidence
Contracted power reached approximately 4.2 GW, up from 3.7 GW at quarter end.
Dependencies
Site replay
Site status
-
Announced
-
Power secured
-
Construction
-
Energised
-
Customer contracted
-
Acceptance
-
Billing
Acceptance
No date or window has been guided.
Customer contracts
No contract disclosure names this site. Where a company announces a customer without naming the location, the contract is held against the company rather than guessed onto a site.
What changed here
-
Contracted power reached approximately 4.2 GW, up from 3.7 GW at quarter end.
A further 500 MW of supply secured within six weeks of the quarter close. Contracted power is a total that already includes active capacity, so this widens the gap between power controlled and power energised rather than closing it.
11 Aug 2026 3700 → 4200 MW -
Active power expanded by nearly 500 MW to reach 1.5 GW.
The largest single-quarter energisation step on the board. The previous value is derived from the company's own "expanded by nearly 500 MWs" wording rather than a separately published Q1 figure.
11 Aug 2026 1000 → 1500 MW