Sites

Every AI data centre T2C tracks: its size, its status, its customer and the latest news naming it. Open a site for what happens next.

23 sites 18 disclose capacity 5 countries
23 shown
APLD

Delta Forge 1

🇺🇸 United States
300 MW

300 MW leased to a high investment-grade hyperscaler, approximately $7.5bn over a 15-year initial term.

Building
APLD

Delta Forge 2

🇺🇸 United States
210 MW

210 MW leased to a high investment-grade hyperscaler, approximately $5.2bn over a 15-year initial term.

Building
APLD

Polaris Forge 1

🇺🇸 United States
400 MW

400 MW leased to CoreWeave, approximately $11bn over a 15-year initial term. 250 MW live as of 1 October 2026.

Billing
APLD

Polaris Forge 2

🇺🇸 United States
200 MW

200 MW leased to an investment-grade hyperscaler, approximately $5bn over a 15-year initial term.

Building
APLD

Polaris Forge 3

🇺🇸 United States
300 MW

300 MW leased to a high investment-grade hyperscaler, approximately $7.5bn over a 15-year initial term.

Building
CRWV

US data centre estate

🇺🇸 United States
1.50 GW

CoreWeave reports fleet-wide rather than per site; the site-level split is not disclosed.

Live
IREN

British Columbia sites

🇨🇦 Canada
Not disclosed

Legacy capacity converting to GPU use.

Status not reported
IREN

Bundey, South Australia

🇦🇺 Australia
Not disclosed

Part of the 5 GW secured portfolio.

Planned
IREN

Childress, Texas

🇺🇸 United States
Not disclosed

Hosts the Microsoft Horizon tranches and the NVIDIA deployment.

Live
IREN

Horizon 1 (Childress)

🇺🇸 United States
50 MW

Delivered to and accepted by Microsoft on 13 August 2026.

Live
IREN

Horizons 2–4 (Childress)

🇺🇸 United States
150 MW

Remaining Microsoft tranches — the balance of the 200 MW contract after Horizon 1's 50 MW.

Building
IREN

Spain

🇪🇸 Spain
Not disclosed

Part of the 5 GW secured portfolio.

Planned
KEEL

Moses Lake, Washington

🇺🇸 United States
18 MW ~13 MW critical IT (est)

18 MW gross project capacity.

Live
KEEL

Panther Creek, Pennsylvania

🇺🇸 United States
350 MW ~250 MW critical IT (est)

350 MW contracted firm power, of which 60 MW is currently energised.

Planned
KEEL

Scrubgrass, Pennsylvania

🇺🇸 United States
1.30 GW

CORRECTION: previously shown as 1.3 GW of secured capacity.

Live
KEEL

Sharon, Pennsylvania

🇺🇸 United States
110 MW ~79 MW critical IT (est)

110 MW gross total site capacity: 30 MW existing energised utility capacity plus 80 MW under an energy-services agreement with associated substation…

Building
KEEL

Sherbrooke, Québec

🇨🇦 Canada
96 MW

96 MW under a conditional transfer and operation agreement.

Planned
NBIS

Kansas City, Missouri

🇺🇸 United States
Not disclosed

US campus build-out.

Building
NBIS

Mäntsälä, Finland

🇫🇮 Finland
310 MW

CORRECTION: 310 MW is the capacity this facility is expected to reach when fully deployed — planned project capacity, not capacity energised today.

Building
WULF

Chesapeake (Maryland)

🇺🇸 United States
210 MW ~150 MW critical IT (est)

Approximately 210 MW operational generation at the Morgantown Generating Station.

Live
WULF

Justified Data Campus (Anthropic)

🇺🇸 United States
401 MW

Approximately 401 MW critical IT on a 20-year initial lease, approximately $19bn contracted revenue over the initial term.

Planned
WULF

Lake Mariner, New York

🇺🇸 United States
438 MW

102 MW revenue-generating critical IT plus 336 MW additional critical IT under construction across CB-4 and CB-5.

Billing
WULF

Muskie (Kentucky)

🇺🇸 United States
1 GW ~714 MW critical IT (est)

1 GW of contracted electric service with Kentucky Power, raised from 500 MW on 5 October 2026.

Planned

Capacity figures state what they measure, and half this estate quotes gross power at the fence while the other half quotes critical IT in the hall. Where a site publishes only a gross figure, the comparable critical IT load is shown beneath it in amber as a T2C estimate — gross ÷ 1.4 — so the list can be read down one column. A site showing Not disclosed has published nothing to derive from: it is never shown as zero and never filled with a peer average. How estimates work.