IREN Limited

IREN · Full stack
All values sourced Last verified 15 Aug 2026

Holds a large secured power portfolio and is the only tracked company with a hyperscaler tranche formally delivered and accepted.

Switched on
50 MWDisclosed minimum

Critical IT load live and drawing power.

Customers have signed for
260 MWDisclosed minimum

Capacity under a signed customer agreement.

Delivery stage
Accepted

The furthest gate with evidence behind it.

Next catalyst
Date unknown

Microsoft Horizons 2–4 — remaining tranches

T2C Reality Score Constructed from sourced records — not a disclosed figure
91 Strong delivery record Derived · how this is calculated
Promise delivery 1 of 1 met 35%
Evidence quality 15 of 20 confirmed 30%
Timeline stability 2 held 20%
Financing Not available Financing is not disclosed as a project milestone. 15%

promise delivery rests on 1 of 1 met; timeline stability rests on 2 held. A small sample moves this score as much as a large one.

Computed over 85% of the score's weight. Financing could not be computed and is excluded rather than counted as passing.

Path to billing Furthest reached anywhere: Acceptance
  1. Power Not disclosed
  2. Billing Not disclosed

A stage is marked complete when any of IREN Limited's 6 tracked projects has reached it — this is the furthest the company has got anywhere, not the state of every site. Open a stage to see which sites evidence it.

Capacity truth Four different measurements
5 GW Secured Gross
260 MW Contracted Critical IT
50 MW Energised Critical IT
~50 MW Billing N/A Estimated · not disclosed

These are four separate disclosures on different bases, not four stages of one funnel. Secured power is measured at the utility connection; the rest are critical IT. They are never subtracted from one another.

~50 MW Estimated Billing 50 MW formally accepted by a customer, taken as billing
What is assumed

Capacity formally accepted by a customer is taken as billing. Acceptance is normally the milestone that starts the revenue clock, but the commercial effect is contract-specific and the company has not separately confirmed that billing has commenced.

Rule: Billing from customer acceptance. Inputs are sourced; the assumption is T2C's. ↗ globenewswire.com

Revenue calculator What billing capacity implies, and what it would be worth

The megawatts and the revenue rate come from what IREN Limited has published. The multiple does not — it is an opinion, and it is the input that moves the answer most. Nothing here is a price target.

Every option above is measured as critical IT, the same basis the revenue rate is derived on. Secured power is deliberately absent: it is gross power at the utility connection, and applying a per-MW contract rate to it would price megawatts that cannot be sold as compute.

MW
Estimated by T2C from accepted capacity
$ m
Derived from IREN’s own contracts

capacity-weighted mean of 2 disclosed contracts (260 MW total) = $10.08m per MW per year

×
An opinion — not a disclosure
m
Fetching from the provider…
Run-rate revenue
Implied enterprise value
Enterprise value per share
Against the live price
How much of that is the multiple
EV / revenueEnterprise value Per sharevs price

IREN Limited at a glance

Every figure below is sourced
IREN

IREN owns and operates data centres powered by a large secured electricity portfolio, and sells AI cloud capacity to hyperscalers and AI developers.

Full stack Reached: Accepted 1% of controlled power switched on

How far it has actually got

Select a step for its evidence

Where the power goes

Power controlled 5 GW GrossBeing built not disclosed measurement changes to Critical ITSwitched on ≥50 MW Critical ITCustomers signed for ≥260 MW Critical ITDelivered and accepted 50 MW Critical ITGenerating revenue not disclosed
Each bar is drawn to the same scale. A dashed row means the company has not published that figure — it is not zero. Where the dashed line appears, the measurement itself changes from power at the utility connection to usable capacity inside the hall, so the step down is a change of definition rather than capacity going missing.

What it owns, and what the customer brings

WHO OWNS WHAT Grid power company Building and cooling company Racks and network company Accelerators company Compute sold company
The company owns every layer from grid power through to the accelerators, and sells finished compute.

Where it operates

6 recorded sites
3
1
1
1

A filled dot is a site with a published capacity figure; an outlined dot is a site named in filings without one. Positions are schematic, not geographic.

Capacity record

Every value with its evidence
MeasureValue and evidence
Secured powerPower capacity controlled through executed utility, interconnection, energy-service, lease or comparable arrangements. It may include capacity already operating as well as capacity awaiting development. Secured power indicates supply control, not customer demand or completed compute capacity. 5 GW ConfirmedGross ↗ sec.gov ↗ sec.govas of 31 Mar 2026
Evidence · 2 sources

Secured global power portfolio, quoted at the utility connection. Not critical IT and not comparable with a critical-IT figure.

As of
31 Mar 2026
Verified
15 Aug 2026
Basis
Gross utility power
Type
Actual
Coverage
Exhaustive total
IREN Reports Q3 FY26 Results IREN Limited (SEC EDGAR) · sec-filing · published 31 Mar 2026 · primary
"...as we scale across our global 5GW secured power portfolio." Also: "2026 expansion to 480MW on track — Horizon 1-4 on track for delivery by year-end", and "2028+ expansion across 5GW secured power underway". Confirms 480 MW is a 2026 expansion target across multiple sites, not construction at one site.
IREN Limited quarterly report, period ended 31 March 2026 IREN Limited (SEC EDGAR) · sec-filing · published 31 Mar 2026 · primary
Development pipelineIdentified development opportunity that is not yet secured — sites under study, options, and applications lodged. Reported separately from secured power and never added to it. Not disclosed Not disclosed
Customer-contractedCompute or capacity a paying customer has committed to under a signed contract. Demand, not supply. Frequently disclosed only for individual named contracts, in which case the site total is a disclosed minimum rather than an exhaustive figure. ≥260 MW ConfirmedDisclosed minimumCritical IT ↗ sec.gov ↗ sec.govas of 1 Jun 2026
Evidence · 2 sources

Microsoft 200 MW plus NVIDIA 60 MW. A disclosed minimum: the further AI developer contracts worth approximately $2.8bn do not disclose megawatts, so the true total is higher.

As of
1 Jun 2026
Verified
15 Aug 2026
Basis
Critical IT load
Type
Disclosed minimum
Coverage
Not exhaustive — may be higher
IREN Limited Form 8-K — Microsoft AI cloud agreement IREN Limited (SEC EDGAR) · sec-filing · published 3 Nov 2025 · primary
Microsoft contract for 200 MW of critical IT capacity, approximately $9.7bn, five-year average term.
IREN Limited Exhibit 99.1 — NVIDIA agreement and AI cloud contracts IREN Limited (SEC EDGAR) · sec-filing · published 1 Jun 2026 · primary
NVIDIA agreement for 60 MW, approximately $3.4bn over a five-year term. Additional AI developer contracts totalling approximately $2.8bn.
Under constructionCapacity with physical construction under way. Capital committed, no revenue from it yet. Not disclosed Not disclosed
Evidence

The 480 MW previously carried here is IREN's wider 2026 gross AI Cloud capacity target across multiple sites — a target, not construction, and not attributable to one site. Held as a target below; no comparable company construction total has been located.

Verified
Not verified
Type
Actual
Coverage
Not exhaustive — may be higher
Energised critical ITCritical IT load live and drawing power. Often described by companies as "active" or "operational" capacity. It does not by itself mean a customer is paying for it. ≥50 MW ConfirmedDisclosed minimumCritical IT ↗ globenewswire.comas of 13 Aug 2026
Evidence · 1 source

Horizon 1 — 50 MW of critical IT delivered and accepted. A disclosed minimum: this is the only tranche with an explicit critical-IT figure, and no company-wide energised total has been published on a comparable basis.

As of
13 Aug 2026
Verified
15 Aug 2026
Basis
Critical IT load
Type
Disclosed minimum
Coverage
Not exhaustive — may be higher
IREN Delivers Horizon 1 to Microsoft and Achieves NVIDIA Exemplar Cloud Status on GB300 NVL72 IREN Limited via GlobeNewswire · company-ir · published 13 Aug 2026 · primary
Horizon 1, 50 MW of critical IT capacity, delivered to and accepted by Microsoft.
Customer-acceptedCapacity formally accepted under the relevant customer agreement. Acceptance may trigger billing or revenue recognition, but the commercial effect is contract-specific and must be separately evidenced. 50 MW ConfirmedCritical IT ↗ globenewswire.comas of 13 Aug 2026
Evidence · 1 source

Horizon 1 delivered to and accepted by Microsoft on 13 August 2026.

As of
13 Aug 2026
Verified
15 Aug 2026
Basis
Critical IT load
Type
Actual
Coverage
Exhaustive total
IREN Delivers Horizon 1 to Microsoft and Achieves NVIDIA Exemplar Cloud Status on GB300 NVL72 IREN Limited via GlobeNewswire · company-ir · published 13 Aug 2026 · primary
Horizon 1, 50 MW of critical IT capacity, delivered to and accepted by Microsoft.
Revenue liveCapacity for which the company has explicitly disclosed that billing, rent commencement or revenue generation has begun. Billing, GAAP revenue recognition and cash receipt are not assumed to occur simultaneously. Not disclosed Not disclosed
Evidence

Acceptance of Horizon 1 is confirmed, but the company has not separately disclosed that billing or revenue has commenced. Acceptance is not assumed to mean revenue-live.

Verified
Not verified
Type
Actual
Coverage
Not exhaustive — may be higher

Targets

Management goals — excluded from all current totals
Under construction target2026 gross AI Cloud capacity target across multiple sites. Excluded from every current-capacity total. 480 MW ConfirmedTargetGross ↗ sec.govas of 31 Dec 2026
Evidence · 1 source

2026 gross AI Cloud capacity target across multiple sites. Excluded from every current-capacity total.

As of
31 Dec 2026
Verified
15 Aug 2026
Basis
Gross utility power
Type
Target
Coverage
Not exhaustive — may be higher
IREN Reports Q3 FY26 Results IREN Limited (SEC EDGAR) · sec-filing · published 31 Mar 2026 · primary
"...as we scale across our global 5GW secured power portfolio." Also: "2026 expansion to 480MW on track — Horizon 1-4 on track for delivery by year-end", and "2028+ expansion across 5GW secured power underway". Confirms 480 MW is a 2026 expansion target across multiple sites, not construction at one site.

Projects and gates

6 recorded
Gates advance independently. Zoning can be granted while environmental approval, financing and interconnection all remain outstanding — a single stage label would hide that.

Childress, Texas

United States
Not disclosed GrossReported

Hosts the Microsoft Horizon tranches and the NVIDIA deployment. The 480 MW previously shown here is IREN's wider 2026 gross AI Cloud target across multiple sites, not this site's capacity.

  1. Site control Complete · 1 source
  2. Utility agreement Not disclosed
  3. Interconnection approved Not disclosed
  4. Zoning approved Not disclosed
  5. Regulatory approval Not disclosed
  6. Environmental approval Not disclosed
  7. Building permits Not disclosed
  8. Financing committed Not disclosed
  9. Long-lead equipment ordered Not disclosed
  10. Construction started Complete · 1 source
  11. Utility energised Not disclosed
  12. Critical IT energised Complete · 1 source 13 Aug 2026
  13. Customer contracted Complete · 1 source
  14. Customer accepted Complete · 1 source 13 Aug 2026
  15. Billing / revenue commenced Not disclosed

Horizon 1 (Childress)

United States
50 MW Critical ITConfirmed

Delivered to and accepted by Microsoft on 13 August 2026.

  1. Site control Not disclosed
  2. Utility agreement Not disclosed
  3. Interconnection approved Not disclosed
  4. Zoning approved Not disclosed
  5. Regulatory approval Not disclosed
  6. Environmental approval Not disclosed
  7. Building permits Not disclosed
  8. Financing committed Not disclosed
  9. Long-lead equipment ordered Not disclosed
  10. Construction started Complete · 1 source
  11. Utility energised Not disclosed
  12. Critical IT energised Complete · 1 source 13 Aug 2026
  13. Customer contracted Complete · 1 source
  14. Customer accepted Complete · 1 source 13 Aug 2026
  15. Billing / revenue commenced Not disclosed
Customer accepted
Target 2026 Actual 13 Aug 2026
Delivered within the guided window
"Horizon 1-4 on track for delivery by year-end" — a window covering all four tranches, not a date for Horizon 1 alone.
↗ sec.govguided 31 Mar 2026

Horizons 2–4 (Childress)

United States
150 MW Critical ITTargetConfirmed

Remaining Microsoft tranches — the balance of the 200 MW contract after Horizon 1's 50 MW. Planned, not delivered, and held separately from accepted capacity.

  1. Site control Not disclosed
  2. Utility agreement Not disclosed
  3. Interconnection approved Not disclosed
  4. Zoning approved Not disclosed
  5. Regulatory approval Not disclosed
  6. Environmental approval Not disclosed
  7. Building permits Not disclosed
  8. Financing committed Not disclosed
  9. Long-lead equipment ordered Not disclosed
  10. Construction started In progress · 1 source
  11. Utility energised Not disclosed
  12. Critical IT energised Not disclosed
  13. Customer contracted Complete · 1 source
  14. Customer accepted Not started
  15. Billing / revenue commenced Not disclosed
Customer accepted
Target 2026 Actual Not disclosed
Not yet reached
"Horizon 1-4 on track for delivery by year-end."
↗ sec.govguided 31 Mar 2026

British Columbia sites

Canada
Not disclosed GrossReported

Legacy capacity converting to GPU use.

  1. Site control Complete · 1 source
  2. Utility agreement Not disclosed
  3. Interconnection approved Not disclosed
  4. Zoning approved Not disclosed
  5. Regulatory approval Not disclosed
  6. Environmental approval Not disclosed
  7. Building permits Not disclosed
  8. Financing committed Not disclosed
  9. Long-lead equipment ordered Not disclosed
  10. Construction started Not disclosed
  11. Utility energised Not disclosed
  12. Critical IT energised Not disclosed
  13. Customer contracted Not disclosed
  14. Customer accepted Not disclosed
  15. Billing / revenue commenced Not disclosed

Spain

Spain
Not disclosed GrossPipelineReported

Part of the 5 GW secured portfolio.

  1. Site control Complete · 1 source
  2. Utility agreement Not disclosed
  3. Interconnection approved Not disclosed
  4. Zoning approved Not disclosed
  5. Regulatory approval Not disclosed
  6. Environmental approval Not disclosed
  7. Building permits Not disclosed
  8. Financing committed Not disclosed
  9. Long-lead equipment ordered Not disclosed
  10. Construction started Not disclosed
  11. Utility energised Not disclosed
  12. Critical IT energised Not disclosed
  13. Customer contracted Not disclosed
  14. Customer accepted Not disclosed
  15. Billing / revenue commenced Not disclosed

Bundey, South Australia

Australia
Not disclosed GrossPipelineReported

Part of the 5 GW secured portfolio.

  1. Site control Complete · 1 source
  2. Utility agreement Not disclosed
  3. Interconnection approved Not disclosed
  4. Zoning approved Not disclosed
  5. Regulatory approval Not disclosed
  6. Environmental approval Not disclosed
  7. Building permits Not disclosed
  8. Financing committed Not disclosed
  9. Long-lead equipment ordered Not disclosed
  10. Construction started Not disclosed
  11. Utility energised Not disclosed
  12. Critical IT energised Not disclosed
  13. Customer contracted Not disclosed
  14. Customer accepted Not disclosed
  15. Billing / revenue commenced Not disclosed
Contract X-ray 3 disclosed agreements
Microsoft 200 MW
Firm
$9.7bn

5-year term, committed.

Optional
None disclosed

The company has disclosed no conditional upside on this agreement.

Delivered
50 MW

Accepted by the customer under this agreement.

Five-year average term. Horizon 1 (50 MW) delivered and accepted 13 Aug 2026.

NVIDIA 60 MW
Firm
$3.4bn

5-year term, committed.

Optional
None disclosed

The company has disclosed no conditional upside on this agreement.

Delivered
None yet

Contracted is not delivered. Nothing has been accepted under this agreement yet.

Five-year term. IREN has not named the site that will serve this agreement.

Other AI developer contracts MW not disclosed
Firm
$2.8bn

Committed value.

Optional
None disclosed

The company has disclosed no conditional upside on this agreement.

Delivered
None yet

Contracted is not delivered. Nothing has been accepted under this agreement yet.

Approximately $2.8bn total contract value. Megawatts not disclosed.

Committed value and conditional maximum are shown apart and never added. Where a company discloses a ceiling — "up to" — the difference depends on events that have not happened.

Contract detail

Every disclosed field
Scroll sideways for all columns →
CustomerMWTerm ValueDeliveredTerms
Microsoft 200 MWCritical IT 5 yr $9.7bn 50 MW Five-year average term. Horizon 1 (50 MW) delivered and accepted 13 Aug 2026.↗ sec.gov ↗ globenewswire.com
NVIDIA 60 MWCritical IT 5 yr $3.4bn Not disclosed Five-year term. IREN has not named the site that will serve this agreement.↗ sec.gov
Other AI developer contracts Not disclosed Not disclosed $2.8bn Not disclosed Approximately $2.8bn total contract value. Megawatts not disclosed.↗ sec.gov

Verified changes

3 events
13 Aug 2026announced 13 Aug 2026

Horizon 1 — 50 MW of critical IT — delivered to and accepted by Microsoft.

The only formally accepted hyperscaler capacity across every company tracked here. Acceptance is the milestone that normally starts the revenue clock, but IREN has not separately disclosed that billing has commenced, so it is not recorded as revenue-live.

Not disclosed50 MW
1 Jun 2026announced 1 Jun 2026

NVIDIA agreement for 60 MW, approximately $3.4bn over a five-year term.

Takes disclosed customer-contracted capacity to a minimum of 260 MW alongside the 200 MW Microsoft contract. Still a minimum — other contracts do not disclose megawatts.

Confirmed↗ sec.gov
200 MW260 MW
1 Jun 2026announced 1 Jun 2026

Additional AI developer contracts totalling approximately $2.8bn.

Megawatts not disclosed, which is precisely why the company's customer-contracted figure is carried as a disclosed minimum rather than an exhaustive total.

Confirmed↗ sec.gov
Not disclosed$2.8bn

Upcoming catalysts

1
IREN

Microsoft Horizons 2–4 — remaining tranches

The balance of the 200 MW Microsoft contract after Horizon 1's 50 MW. No delivery date has been published for the remaining tranches, so no date is shown — the timing is genuinely unknown.

Reported↗ sec.gov

Make your call

Private to this browser

Write down what you expect IREN Limited to deliver, and by when. T2C scores it later against the same evidenced gates it uses everywhere else — not against the share price.

Stored in this browser only. Clearing your browser data deletes it, and T2C never receives it — there is nowhere for it to be sent.

About IREN

Last verified 15 Aug 2026

IREN owns and operates data centres powered by a large secured electricity portfolio, and sells AI cloud capacity to hyperscalers and AI developers.

IREN is an Australian-listed operator that secures grid power at scale, builds data centres on that power, and increasingly sells finished GPU compute rather than leasing empty space. It converted from bitcoin mining infrastructure toward AI cloud, and is currently the only company tracked here with a hyperscaler tranche formally delivered and accepted.

Company facts

Legal name
IREN Limited
Ticker / exchange
IREN · NASDAQ
Founded
Not disclosed
Headquarters
Sydney, New South Wales, Australia
Business model
Full stack
Last verified
15 Aug 2026

Who leads it

This company is led by co-chief executives. Both are recorded; neither is presented as the sole CEO.
Daniel Roberts
Co-Founder and Co-Chief Executive Officer

Co-founder and co-CEO of IREN, and a director of the company. Background in finance, infrastructure and renewables.

↗ iren.com ↗ sec.govverified 15 Aug 2026
Will Roberts
Co-Founder and Co-Chief Executive Officer

Co-founder and co-CEO of IREN, and a director of the company. Background in finance, real assets and commodities markets.

↗ iren.com ↗ sec.govverified 15 Aug 2026

What it sells

  • AI cloud compute sold by contract to hyperscalers and AI developers
  • Owned and operated data centres built on self-secured grid power
  • Bitcoin mining from earlier operations

How it makes money

Owns the accelerators and sells finished compute. Captures far more revenue per megawatt, and carries the chip capital cost and obsolescence risk to match.

Where it operates

  • United States (Texas)
  • Canada (British Columbia)
  • Australia
  • Spain

Operating presence as disclosed. This is not the same as future pipeline — a named location may hold nothing but secured power.

Publicly disclosed customers

  • Microsoft
  • NVIDIA

Only customers the company has named publicly. Several tracked companies describe counterparties only as "investment-grade hyperscaler", and those are not guessed at here.

Official links

Social accounts are shown only where the link was found on a company-controlled domain. A verification badge alone is not treated as evidence.

Sources

5 documents