My watchlist
Data
Display
Estimates are derived by T2C from disclosed figures. Switch them off to see only what companies have published.
Focus mode Supporting context hidden. Figures, their basis, confidence and sources are unchanged — nothing that qualifies a number is hidden.

Track

Sector now

Tap a name

…

How this is counted

A count of words in headlines. Not a forecast and not advice.

Childress

One campus
Illustrative completed data-centre campus with electrical infrastructure at blue hour 50MW Horizon 1 (Childress) SharedLandSharedPermitsSharedGrid accessOpenTransformers and switchgear

Land. Childress site control is confirmed. These halls stand on that land.

Permits. Construction on this campus is confirmed. The ledger does not keep a separate permit.

Grid access. Horizon 1 critical IT was energised on 13 Aug 2026. That is this campus.

Transformers and switchgear. No gate on this record. That is not a fail.

Full record

Illustrative image; not site evidence.

Illustrative aerial view of a large data-centre campus under construction 150MW Horizons 2–4 (Childress) SharedLandPartialPermitsPartialGrid accessOpenTransformers and switchgear

Land. Childress site control is confirmed. These halls stand on that land.

Permits. Construction is reported in progress beside a hall that is already accepted. A named permit is not its own gate.

Grid access. Horizon 1’s 50 MW is energised here. A separate interconnect for the remaining 150 MW is not disclosed.

Transformers and switchgear. No gate on this record. That is not a fail.

Full record

Illustrative image; not construction evidence for a named project.

Illustrative completed data-centre campus with electrical infrastructure at blue hour — Childress, Texas InLandSharedPermitsSharedGrid accessOpenTransformers and switchgear

Land. Confirmed.

Permits. Construction on this campus is confirmed. The ledger does not keep a separate permit.

Grid access. Horizon 1 critical IT was energised on 13 Aug 2026. That is this campus.

Transformers and switchgear. No gate on this record. That is not a fail.

Full record

Illustrative image; not site evidence.

Other places

Not Childress
Illustrative data-centre campus, electrical grid, renewable generation and nearby community — British Columbia sites PartialLandOpenPermitsOpenGrid accessOpenTransformers and switchgear

Land. Reported, not confirmed.

Permits. No gate on this record. That is not a fail.

Grid access. No gate on this record. That is not a fail.

Transformers and switchgear. No gate on this record. That is not a fail.

Full record

Illustrative context image; do not infer a named project's energy mix or local impact.

Illustrative data-centre campus, electrical grid, renewable generation and nearby community — Spain PartialLandOpenPermitsOpenGrid accessOpenTransformers and switchgear

Land. Reported, not confirmed.

Permits. No gate on this record. That is not a fail.

Grid access. No gate on this record. That is not a fail.

Transformers and switchgear. No gate on this record. That is not a fail.

Full record

Illustrative context image; do not infer a named project's energy mix or local impact.

Illustrative data-centre campus, electrical grid, renewable generation and nearby community — Bundey, South Australia PartialLandOpenPermitsOpenGrid accessOpenTransformers and switchgear

Land. Reported, not confirmed.

Permits. No gate on this record. That is not a fail.

Grid access. No gate on this record. That is not a fail.

Transformers and switchgear. No gate on this record. That is not a fail.

Full record

Illustrative context image; do not infer a named project's energy mix or local impact.