Building

Horizons 2–4 (Childress)

🇺🇸 United States · IREN Limited

Size
150 MW Critical IT
Customer
Microsoft
Status
Under construction or being commissioned.

Remaining Microsoft tranches — the balance of the 200 MW contract after Horizon 1's 50 MW. Planned, not delivered, and held separately from accepted capacity.

News about this site

  • Loading the latest stories…

Key facts

  • Horizons 3-4 in late-stage construction at the FY26 results.
  • Horizon 2 commissioning under way at the FY26 results (27 August 2026).